St. Louis, Missouri. SL2
165,000 sf Tier III DataCenter
100MW (up to 1GW Expansion)
N+1 UPS Distribution
N+1 Diesel Generators
N+1 Redundant Cooling
Multi – 100G Networking
RFS
100MW Total – Q3 2026
150MW Total – Q1 2027
200MW Total – Q3 2027
200MW+ Total – TBD
Raised Flooring
NVIDIA B200, GB300NVL72 Supported
AI Focused – up to 200KW Racks
Liquid Cooling
Services
Colocation
200KW Racks
NVIDIA Support
Liquid to Chip
Air Cooled
Private Ai Pods
Internet Access
Technical Services
Data Center Specifications
Onsite 24/7
Manned Security
Monitored Camera
Yes
Multi-door Mantrap
Yes
Access
HID Access
Fire Suppression
FM 200
Remotely Monitored
Yes
Year Built
2015 (Renovated 2025)
Floors
2
Structure
Concrete Steel
Exterior
EIFS Concrete
Flood Plain
No
Ceiling
32′
Data Hall
100,000 sf
Total Space
160,000 sf
Spaces
Cabinets, Cages
Floor
Concrete Epoxy
Primary / Expansion
100MW (+1GW Turbine)
Expansion RFS
Expansion Start Q3 2026
Expansion
Grid + Turbine
Provider
Self
Redundant Feeds
Yes
UPS
N+1 Redundant
Load Design
Up to 200kW per Cabinet
Configuration
(Grid + Turbine) + Generator + UPS
Entrances
2 Diverses
ATS
Yes
Battery Type
Lead Acid
Battery Monitoring
Yes
Backup Power
N+1 Redundant
Backup Runtime
48 Hours
Remote Hands
Yes, 24/7
Managed Service
Yes
Shipping and Storage
Yes
Support





