St. Louis, Missouri. SL2

165,000 sf Tier III DataCenter
100MW (up to 1GW Expansion)
N+1 UPS Distribution
N+1 Diesel Generators
N+1 Redundant Cooling
Multi – 100G Networking

RFS
100MW Total – Q3 2026
150MW Total – Q1 2027
200MW Total – Q3 2027
200MW+ Total – TBD

Raised Flooring
NVIDIA B200, GB300NVL72 Supported
AI Focused – up to 200KW Racks
Liquid Cooling

Services

Colocation
200KW Racks
NVIDIA Support
Liquid to Chip
Air Cooled
Private Ai Pods
Internet Access
Technical Services

Data Center Specifications

Onsite 24/7

Manned Security

Monitored Camera

Yes

Multi-door Mantrap

Yes

Access

HID Access

Fire Suppression

FM 200

Remotely Monitored

Yes

Year Built

2015 (Renovated 2025)

Floors

2

Structure

Concrete Steel

Exterior

EIFS Concrete

Flood Plain

No

Ceiling

32′

Data Hall

100,000 sf

Total Space

160,000 sf

Spaces

Cabinets, Cages

Floor

Concrete Epoxy

Primary / Expansion

100MW (+1GW Turbine)

Expansion RFS

Expansion Start Q3 2026

Expansion

Grid + Turbine

Provider

Self

Redundant Feeds

Yes

UPS

N+1 Redundant

Load Design

Up to 200kW per Cabinet

Configuration

(Grid + Turbine) + Generator + UPS

Entrances

2 Diverses

ATS

Yes

Battery Type

Lead Acid

Battery Monitoring

Yes

Backup Power

N+1 Redundant

Backup Runtime

48 Hours

Remote Hands

Yes, 24/7

Managed Service

Yes

Shipping and Storage

Yes

Photos

Floorplan